Skip to main content
Construction Progress and Handover
Launch-ready with core equipment
One-site-visit eligible

Change-order evidence package

Change-order evidence package from one coordinated property-data capture.

Price from
$1,500

Fixed fee per property at the Essential scope

Site visits
One

Booked with you in advance

Delivery
5–21 days

Calendar days after the completed visit, by scope

You receive
5 deliverables

Published to your workspace

What it is

Scope of this service cell

Provides a dated construction evidence package focused on change-order evidence package, using the shared Property Intelligence Baseline wherever possible.

Creates objective, dated evidence of current progress and a reusable handover record.

Customer value

  • Gives the client a clearly defined change-order evidence package output instead of an ambiguous bundled promise.
  • Reuses the same controlled site visit, reducing duplicated travel, access coordination and capture cost.
  • Preserves source evidence, validation state, professional-review status and intended-use limitations.
  • Can be activated independently or grouped with related service cells in a larger package.

Ideal client personas

  • Owners
  • Developers
  • General contractors
  • Lenders
  • Architects
  • Facility teams

In plain English

This service in five answers

What you get out of it

Gives the client a clearly defined change-order evidence package output instead of an ambiguous bundled promise.

What we actually do

One visit creates one milestone. Time-series progress requires repeated milestone visits.

What you receive

5 deliverables, published to your workspace: Change-order evidence package; Source and evidence manifest; Assumptions, exclusions and limitations statement; and more.

What you prepare

Confirm the property address, included buildings/areas and authorized access window.; Identify the business decision, deadline, intended reliance and recipients.; Provide available plans, surveys, invoices, asset lists, leases, maintenance records and prior studies.

What this is not

Documentation does not independently certify pay applications, code compliance, workmanship or design conformance.

Buying triggers

  • Acquisition or refinance
  • Renovation or construction
  • Insurance or risk review
  • Facility operations or capital planning
  • Need for remote review or a persistent property record

One site visit

One visit creates one milestone. Time-series progress requires repeated milestone visits.

How it works

What happens, step by step

  1. 01

    1. Scope confirmation

    We confirm which of the five scopes your property falls into, the exact price, and the access we need. You receive it in writing before anything is scheduled.

  2. 02

    2. Site visit

    Our team attends on the agreed date and captures the property. One visit creates one milestone. Time-series progress requires repeated milestone visits.

  3. 03

    3. Processing

    We process the capture into the deliverables listed for this service, each labelled with its method, accuracy statement and intended use.

  4. 04

    4. Delivery and review

    Deliverables are published to your workspace within 7-21 calendar days depending on scope, with the revision rounds included in your scope.

What you receive

  • Change-order evidence package
  • Source and evidence manifest
  • Assumptions, exclusions and limitations statement
  • Validation and professional-review status
  • Client-safe delivery package

What you provide

  • Confirm the property address, included buildings/areas and authorized access window.
  • Identify the business decision, deadline, intended reliance and recipients.
  • Provide available plans, surveys, invoices, asset lists, leases, maintenance records and prior studies.
  • Identify occupied, restricted, hazardous, privacy-sensitive or security-sensitive areas.
  • Provide an onsite contact and knowledgeable property representative.
  • Notify occupants and obtain any publication or model-sharing permissions required by the scope.

When we consider the work complete

  • The change-order evidence package scope and intended use are approved.
  • Source coverage required for change-order evidence package is complete or exceptions are explicit.
  • Capture date, plan/schedule reference, visible status, unresolved exceptions and client-safe issue package are complete.
  • Every material fact is labeled observed, measured, calculated, reported, document-supported, estimated or professionally concluded.
  • Required equipment, software versions, coordinate/measurement information and operators are recorded.
  • Independent QA and any required qualified review are complete.
  • Pricing scope, included revisions, hosting/retention and third-party fees match the agreement.
  • The issued version, transmittal, checksum or file manifest, permitted use and prohibited use are retained.

How to prepare the property

  • Confirm the property address, included buildings/areas and authorized access window.
  • Identify the business decision, deadline, intended reliance and recipients.
  • Provide available plans, surveys, invoices, asset lists, leases, maintenance records and prior studies.
  • Identify occupied, restricted, hazardous, privacy-sensitive or security-sensitive areas.
  • Provide an onsite contact and knowledgeable property representative.
  • Notify occupants and obtain any publication or model-sharing permissions required by the scope.

Delivery method

Exactly how this work is executed and checked

The same documented procedure runs on every engagement: field steps, processing steps, the quality gates a deliverable must pass, what happens when conditions change, and who is accountable at each stage.

On site, step by step

  1. Capture the source observations and geometry required specifically for change-order evidence package.
  2. Confirm the client decision, intended use, included areas, access, privacy, accuracy class and professional-review requirements.
  3. Review available plans, records, prior captures and site constraints before mobilization.
  4. Execute the applicable aerial, Matterport, ground-detail, manual-measurement and interview tasks under the approved master capture plan.
  5. Perform an onsite completeness review and recapture missing or defective evidence before demobilization.
  6. Create two verified source-data copies and reconcile captured files to the mission and room/asset registers.

After the visit, step by step

  1. Produce and structure the change-order evidence package output according to its family standard.
  2. Ingest immutable sources, calculate checksums and assign property, capture and evidence identifiers.
  3. Process the applicable imagery, point clouds, maps, models, documents or registers using the controlled workflow.
  4. Link every material output to its source, evidence class, validation state and intended-use restriction.
  5. Perform independent technical and editorial QA, resolve exceptions and obtain required professional review.
  6. Issue the approved deliverable through the client-safe channel and retain the exact issued version and manifest.

Quality gates every deliverable must pass

  • Coverage check: every space, elevation and asset named in your confirmed scope is captured, and any gap is recorded with the reason before the crew leaves site.
  • Accuracy check: the registered data is measured against control and released only when it meets the accuracy class published for your scope.
  • Deliverable check: every item on this service's deliverable list is produced, named to the standard file convention and opens correctly.
  • Boundary check: any observation that requires a licensed professional is labelled as a candidate for determination rather than presented as a conclusion.
  • Release check: a named quality reviewer signs the accuracy statement before anything is published to your workspace.

Definition of done

  • The change-order evidence package scope and intended use are approved.
  • Source coverage required for change-order evidence package is complete or exceptions are explicit.
  • Capture date, plan/schedule reference, visible status, unresolved exceptions and client-safe issue package are complete.
  • Every material fact is labeled observed, measured, calculated, reported, document-supported, estimated or professionally concluded.
  • Required equipment, software versions, coordinate/measurement information and operators are recorded.
  • Independent QA and any required qualified review are complete.
  • Pricing scope, included revisions, hosting/retention and third-party fees match the agreement.
  • The issued version, transmittal, checksum or file manifest, permitted use and prohibited use are retained.

Realistic timeline at the Standard scope: 7 calendar days from the completed site visit to delivery in your workspace.

If something does not go to plan

  • Access denied, unsafe or incomplete on the day: the crew stops, records the condition with time and photo evidence, and your engagement lead contacts you the same working day before any further cost is incurred.
  • Property facts differ from the confirmed scope (extra buildings, floors or area): capture pauses at the confirmed boundary and we reissue the scope in writing for your approval before continuing.
  • Weather, airspace or safety restriction: the visit is rescheduled at no additional mobilization charge when it is called by us.
  • A finding requires a licensed professional: we document the observation, label it as a candidate for determination, and refer it to your qualified professional rather than concluding on it.
  • A quality gate fails in review: the deliverable is held, the gap is recaptured or reprocessed, and delivery timing is reissued to you in writing.

Who does what

Engagement lead
Confirms the scope, price and access in writing, and is your single point of contact throughout.
Field capture crew
Executes the documented field procedure and records conditions, coverage and any deviation on site.
Processing technician
Registers, reconstructs and structures the capture into the deliverables listed for this service.
Quality reviewer
Verifies every quality gate and the accuracy statement before anything is released to you.
Your qualified professional
Retained by you, and the only party who issues sealed, certified or legally binding conclusions.

Equipment

Capability used for this cell

DJI Mavic 3 Pro Cine

confirmed-owned

Aerial stills, obliques, roof/site imagery, cinematic footage and controlled photogrammetry imagery from the 4/3 CMOS Hasselblad main camera and 70 mm / 166 mm telephoto cameras.

Electronic shutter and consumer GNSS; does not by itself create legal-survey or RTK-grade deliverables.

Matterport Pro3

confirmed-owned

Interior and selected exterior LiDAR/visual capture, digital twins and exportable spatial data.

Not automatically a sealed survey, construction drawing or licensed engineering product.

Ground-level still camera or high-quality phone camera

recommended-not-confirmed

Nameplates, detail imagery, facade/interior overlap and evidence photographs.

Must follow privacy and evidence-handling procedures.

Spreadsheet, document and PDF reporting tools

platform-required

Registers, takeoffs, evidence binders, proposals and client deliverables.

Professional conclusions require authorized review.

S3-compatible object storage or controlled NAS

platform-required

Raw imagery, E57, LAS/LAZ, GeoTIFF, models, splats and issued technical files.

Private data requires access controls, signed links, retention and audit logging.

Pricing

Five scopes. One exact price for your property.

Find the scope your property fits, and that is the price. Billing basis: fixed fee per property, invoiced per property in the order.

Scope 1

Essential

$1,500

Fixed fee, per property. Standalone price.

One small building or single-focus site with straightforward access.

Buildings:
1 building
Enclosed area:
up to 5,000 sq ft enclosed
Site:
up to 1 acre
Delivery:
5 calendar days after the visit

You provide

  • Property address and a single on-site contact
  • Access window of at least 3 hours during daylight
  • Any existing floor plans or site drawings you already hold

Included

  • One scheduled site visit
  • Standard capture for this service at the published accuracy statement
  • The service's standard deliverable set, published to your workspace
  • One round of clarification questions after delivery

Not included

  • Return visits caused by denied or incomplete access
  • Qualified professional review, sealed or certified work, and filing fees
  • Laboratory testing and third-party data or export fees

Scope 2

Standard

$3,125

Fixed fee, per property. Standalone price.

A typical single commercial building with normal interior complexity.

Buildings:
1 building
Enclosed area:
5,001-25,000 sq ft enclosed
Site:
up to 3 acres
Delivery:
7 calendar days after the visit

You provide

  • Property address and a single on-site contact
  • Access window of at least one working day
  • Room or unit list, and any existing drawings you already hold

Included

  • One scheduled site visit
  • Standard capture for this service at the published accuracy statement
  • The service's standard deliverable set, published to your workspace
  • One revision round within 30 days of delivery

Not included

  • Return visits caused by denied or incomplete access
  • Qualified professional review, sealed or certified work, and filing fees
  • Laboratory testing and third-party data or export fees

Scope 3

Extended

$4,750

Fixed fee, per property. Standalone price.

A larger building, or two buildings documented in the same mobilization.

Buildings:
up to 2 buildings
Enclosed area:
25,001-75,000 sq ft enclosed
Site:
up to 10 acres
Delivery:
10 calendar days after the visit

You provide

  • Property address, site contact and building access schedule
  • Access window of up to two working days
  • Existing drawings, asset lists or prior reports you already hold

Included

  • One mobilization covering the buildings in scope
  • Standard capture for this service at the published accuracy statement
  • The service's standard deliverable set, published to your workspace
  • One revision round within 30 days of delivery
  • A 30-minute delivery walkthrough call

Not included

  • Return visits caused by denied or incomplete access
  • Qualified professional review, sealed or certified work, and filing fees
  • Laboratory testing and third-party data or export fees
  • After-hours or shutdown-window capture

Scope 4

Complex

$6,375

Fixed fee, per property. Standalone price.

Multi-building properties, restricted access, or occupied operations.

Buildings:
up to 4 buildings
Enclosed area:
75,001-150,000 sq ft enclosed
Site:
up to 25 acres
Delivery:
14 calendar days after the visit

You provide

  • Property address, site contact and a per-building access schedule
  • Access window of up to four working days, including any escort requirement
  • Existing drawings, asset lists and safety induction requirements

Included

  • One mobilization covering the buildings in scope
  • Standard capture for this service at the published accuracy statement
  • The service's standard deliverable set, published to your workspace
  • Two revision rounds within 45 days of delivery
  • A 60-minute delivery walkthrough call

Not included

  • Return visits caused by denied or incomplete access
  • Qualified professional review, sealed or certified work, and filing fees
  • Laboratory testing and third-party data or export fees
  • Confined-space, rope-access or hazardous-area entry

Scope 5

Campus

$8,000

Fixed fee, per property. Standalone price.

Campuses and large sites above the Complex limits. The base price covers the first 4 buildings and 150,000 sq ft; published add-on rates cover the rest.

Buildings:
5 or more buildings
Enclosed area:
over 150,000 sq ft enclosed
Site:
over 25 acres
Delivery:
21 calendar days after the visit

You provide

  • Building schedule with enclosed area per building
  • Site access plan, escort and induction requirements
  • Existing drawings, asset registers and prior documentation

Included

  • Phased mobilization across the buildings in scope
  • Standard capture for this service at the published accuracy statement
  • The service's standard deliverable set for every building, published to your workspace
  • Two revision rounds within 45 days of final delivery
  • Delivery walkthrough call and a written scope record

Not included

  • Return visits caused by denied or incomplete access
  • Qualified professional review, sealed or certified work, and filing fees
  • Laboratory testing and third-party data or export fees
  • Confined-space, rope-access or hazardous-area entry

Which tier applies to your property

A property qualifies for the lowest scope that satisfies every parameter below. If any single parameter exceeds a tier, the next tier applies.

Scope parameters that decide which published tier applies to a property
Scope parameterEssential$1,500Standard$3,125Extended$4,750Complex$6,375Campus$8,000
Buildings1 building1 buildingup to 2 buildingsup to 4 buildings5 or more buildings
Enclosed areaup to 5,000 sq ft enclosed5,001-25,000 sq ft enclosed25,001-75,000 sq ft enclosed75,001-150,000 sq ft enclosedover 150,000 sq ft enclosed
Site areaup to 1 acreup to 3 acresup to 10 acresup to 25 acresover 25 acres
Floors1-2 floorsup to 3 floorsup to 5 floors per buildingup to 10 floors per buildingNo floor limit; counted per building in the schedule
Occupancy and accessUnoccupied or lightly occupied, no escort requiredOccupied during normal business hours, no escort requiredOccupied, scheduled access windows, escort where requiredFully occupied or restricted operations, escort and induction assumedContinuous operations, multi-party access coordination
Assets catalogedup to 50 cataloged assetsup to 250 cataloged assetsup to 750 cataloged assetsup to 2,000 cataloged assetsUnlimited assets; register scoped per building
Existing documents reviewedup to 10 existing documents reviewedup to 25 existing documents reviewedup to 50 existing documents reviewedup to 100 existing documents reviewedUnlimited existing documents reviewed
Capture densityStandard density — primary spaces and elevationsStandard density — all accessible rooms and elevationsElevated density — all accessible spaces plus roof and siteElevated density across all buildings, roofs and siteElevated density campus-wide, phased by building
Accuracy classDocumentation class: dimensions ±2 in for planning useDocumentation class: dimensions ±2 in for planning useSurvey-support class: dimensions ±1 in, accuracy statement issuedSurvey-support class: dimensions ±1 in, accuracy statement issuedSurvey-support class: dimensions ±1 in, accuracy statement per building
Turnaround5 calendar days after the completed visit7 calendar days after the completed visit10 calendar days after the completed visit14 calendar days after the completed visit21 calendar days after the final completed visit
Travel and mobilizationOne mobilization; first 60 one-way road miles from Erie, PA includedOne mobilization; first 60 one-way road miles from Erie, PA includedOne mobilization; first 60 one-way road miles included, the rest itemizedOne phased mobilization; travel itemized under the published road-mile rulePhased mobilization; travel itemized under the published road-mile rule
Workspace hostingFirst 12 months of workspace hosting includedFirst 12 months of workspace hosting includedFirst 12 months of workspace hosting includedFirst 24 months of workspace hosting includedFirst 24 months of workspace hosting included
Professional reviewInternal QA review; no licensed professional review includedInternal QA review; no licensed professional review includedInternal QA review; licensed review quoted separately if requiredInternal QA review plus a named senior reviewer sign-offInternal QA review plus a named senior reviewer sign-off

How the price is calculated

  1. Every service publishes five named scopes. A property qualifies for exactly one scope, decided by its building count and enclosed area.
  2. The price of a scope is fixed: the service's Essential price plus 0%, 25%, 50%, 75% or 100% of the gap between its Essential and Campus prices, rounded to the nearest $25.
  3. Campus properties add the published per-extra-building and per-extra-25,000-sq-ft rates shown on the service page.
  4. Multi-property orders are priced property by property from each property's own facts, and the subtotals are added. Facts from different properties are never combined into one scope and multiplied.
  5. Activating a service during the same site visit as another service uses that service's published activation price instead of its standalone price.

For this service the Campus add-on rates are $225 per building beyond the first four and $150 per complete 25,000 sq ft beyond 150,000 sq ft.

Never included in the price

  • Qualified professional review, sealed or certified deliverables, permit and filing fees
  • Laboratory testing, third-party data purchases and external export fees
  • Travel beyond the first 60 one-way road miles from Erie, PA, itemized separately under the published road-mile rule
  • Return visits caused by access that was denied, unsafe or incomplete on the scheduled day

Adding this to another service in the same visit

When this service is activated during a site visit already scheduled for another service, the same five scopes apply at the activation price: Essential $750, Standard $1,825, Extended $2,875, Complex $3,950, Campus $5,000.

Optional hosting

Continued hosting and update readiness is optional and billed separately at $1,500 per month for Essential and Standard scopes and $12,000 per month for Extended, Complex and Campus scopes. You can cancel it without affecting deliverables already issued.

Charged separately, never folded into the scope price

Travel beyond the included one-way road miles — $1.15 per one-way road mile after the first 60
Measured as one-way driving distance from our Erie, PA office to the property on the shortest practical route, confirmed in writing before scheduling. Travel is always a separate invoice line, never folded into the scope fee.
Qualified professional review — Billed at the professional's own rate
Licensed surveyors, engineers, appraisers, tax professionals and retained experts contract and bill separately. We never include their fee in a scope price or represent their conclusions as ours.
Interior LiDAR export fees — Passed through at documented cost
Interior LiDAR deliverables (E57 point cloud, MatterPak, floor plans, CAD/BIM exports) are produced through the Matterport cloud service, whose per-export or subscription fees are passed through at cost and named on the invoice.
Third-party data, testing and filing — Passed through at documented cost
Records purchases, laboratory testing, permits, airspace authorizations and filing fees are shown at cost with the source named.
Workspace hosting after the included term — Optional monthly fee shown on the service page
Hosting keeps the property record live and update-ready. Cancelling it never affects deliverables already issued to you.
Return visits and after-hours capture — Priced at the same published scope ladder
Only applies where access was denied, unsafe or incomplete on the agreed day, or where you request a shutdown or after-hours window.

These are published planning prices, not a guaranteed quote. We confirm the applicable scope, the exact fee and any separately identified travel, professional and third-party charges in writing before anything is scheduled.

Travel, itemized separately

  • The first 60 one-way road miles from our Erie, PA office are included in every published scope price.
  • Beyond that, travel is charged at $1.15 per one-way road mile — one way only, not round trip.
  • Road miles are measured on the shortest practical driving route by a mapping service when your visit is scheduled, and the exact number is written into your scope confirmation before booking.
  • At 150 one-way road miles or more, an overnight stay is pre-approved: lodging at documented cost up to $185 per night plus a $75 per-day per-diem for each crew member.
  • Every travel figure appears as its own invoice line, separate from the fixed scope fee and from any professional or third-party charge.
  • We do not estimate mileage automatically anywhere on this site. Any figure you model below is your own input, used to show how the published rule applies.

Enter the confirmed one-way road miles to see how the published travel rule applies. We do not calculate driving distance for you here.

Price this order exactly

Add each property, choose the scope its own facts fall into, and the exact total is calculated for Change-order evidence package.

Standard base $3,125 = $3,125

Exact price per property and order total
PropertyScopeSubtotal
Property 1Standard$3,125
Order total (1 property)$3,125
Fixed fee
Delivery within 7 calendar days of the completed visit

Each property is priced from its own facts and the subtotals are added. Facts from different properties are never combined into one scope. Taxes, professional review, sealed work and third-party fees are separate.

Prices last reviewed 2026-08-04, shown in USD. Qualified professional review, sealed work, filing, laboratory testing and third-party export fees are separate unless explicitly included.

Professional review

Qualified survey, tax, engineering, roofing, thermal, insurance, valuation or legal review when the intended use requires it.

Limitations and boundaries

  • Documentation does not independently certify pay applications, code compliance, workmanship or design conformance.
  • Documentation does not independently certify pay applications, code compliance, workmanship or design conformance.
  • Visible and accessible conditions only unless records or specialized investigation support otherwise.
  • Deliverable fitness depends on the stated source, control, validation and review status.

Next step

Add Change-order evidence package to your capture plan.

Tell us the property and the decision. You get a written scope with an exact price before anything is scheduled.

Request a Property PlanThe offer